for Rendering, for Constructive, for metric calculation, etc.) BIM Use: the use of the model once finished (e.g. Level of Development: the level of development and detail of the 2D and 3D elements of the project. BIM Execution Plan: a contractual document which defines the design standards, software and all executive methods according to which the BIM order must be developed. Furthermore, you can become a BIM Expert by receiving 68 hours of lessons / 2 BIM courses (BIM Basic and BIM Advanced). Correctly configuring the file’s parameters before modeling is an essential step in obtaining concrete and precise results.įind out how to correctly use Revit's BIM methodology for all types of projects through GoPillar Academy’s various tutorials. In this case, or if more information is needed, simply create a template or fill out a standard Revit template during project development with all the aforementioned settings, keeping in mind the “beacon”: the LoD and BIM Use.Īfter following these steps and precautions, our Revit file will be ready to use, ensuring multidisciplinary information consistency. Revit is a database that keeps track of everything (even internal errors), so the end result would be a file that’s much heavier than normal and full of corruptions from the previous project(s). Most importantly, you should not rename and empty a previous Revit project of its 2D / 3D elements to begin a new project.
These templates would then be maintained over time, according to the evolution of families and design style. Ideally, there would be a standard template for the typical types of buildings. In the event that the current project is similar to a previous one, the first step would be to extract the old project’s template. Without a BEP, the design path should be studied at length to better predict what needs to be inserted into the project file.
If there's a BEP available, it would be easier to determine which families (building components such as doors, windows, etc.) to preload in the Revit file, as well as how to set the views, and the architectural, structural or plant settings that might be required. The step involving a good template setup is equally fundamental and delicate. A URS coordination file and shared coordinates are required. Design of multiple buildings in the same lot: each building has its own package of files (one for each discipline) and all files are stored inside an empty Revit file (Federated Model ).Otherwise, it’s better to have a URS coordination file with shared coordinates. Single-file modeling should only be used for very small projects. Multi-Discipline Design: decide whether to model all disciplines using the same file or separate them into different files.